Guide: Due to the vast territory of our country, there is still a considerable market for small-capacity industrial boilers in vast rural areas and towns outside of large and medium cities. In recent years, the real estate market across the country has developed rapidly, the market demand for large-capacity hot water boilers has increased, and large-capacity industrial boilers with a capacity of more than 35t/h have increased sharply.
Due to the vast territory of our country, there is still a considerable market for small-capacity industrial boilers in vast rural areas and towns outside of large and medium-sized cities. In recent years, the real estate market across the country has developed rapidly, the market demand for large-capacity hot water boilers has increased, and large-capacity industrial boilers with a capacity of more than 35t/h have increased sharply.
Let’s introduce the main steps of hot water boiler pipe installation: 1. The water supply pipe installation should start from the equipment connection end, extend outward based on the pipe interface on the equipment, and pay attention to the installation under the heating pipe. The highest point is equipped with an exhaust valve, and the drain pipe is connected to the ground drain. A trap is set at the lowest point to ensure easy operation. Elbows should be used as little as possible on the pipe.
If water containing hardness enters the boiler without treatment, after a period of operation, some solid deposits will be firmly attached to the heating surface of the boiler water side. This phenomenon is called scaling. The solid deposits sticking to the heated surface are called scales. Under certain conditions, solid deposits will also precipitate in the pot water in a loosely suspended state, called slag. The water slag can be removed with the sewage, but if the sewage is not discharged in time, part of the water slag will also be deposited on the heating surface or the place where the water flow is slow and converted into scale (usually called "secondary scale"). The boiler is online. .
YQL series vertical gas-fired heat-conducting oil furnace has wide fuel adaptability, and can be adapted to various fuels such as natural gas, coal gas, biogas, diesel, light oil, and adopts a three-pass round coil design, which has sufficient heating surface. With advanced combustion device The NOx emission is lower than 30mg/m3, and the environmental protection effect is remarkable. At the same time, in order to better improve the utilization rate of heat energy, our company has also equipped energy-saving equipment such as economizers, air preheaters or waste heat boilers at the end of the flue of its boilers, and the thermal efficiency can be as high as 95%.
Through the transformation of coal-fired boilers and the addition of environmental protection equipment, it can basically meet the user's requirements for boiler output and environmental protection, but this is not the best combustion method for biomass particles. At the same time, the industrialization of biomass raw material collection, transportation, and processing The degree is not high, and my country’s biomass utilization still has a long way to go. xinli Boiler is bound to keep up with the pace of the times.