Welcome to XinLi Boiler

email Email:  [email protected]        

FAQ
Home > Solution > FAQ

Matters needing attention when gas steam boiler blowdown

2021-01-14 09:53    page view:

Guide: After a gas-fired steam boiler has been operated for a period of time, certain dirt will be generated. These dirt need to be discharged out of the boiler within a limited time to maintain the good operation of the gas-fired steam boiler. 1. What is the purpose of the gas steam boiler blowdown? 1. Remove the suspended foam on the boiler water surface, thereby reducing the salt content and alkali content of the boiler water, and avoiding the phenomenon of co-evolution of steam and water. The gas steam boiler is running for a period of time After that, a certain amount of dirt will be generated, and these dirt need to be discharged out of the boiler within a limited time to maintain the good operation of the gas steam boiler. 1. What is the purpose of gas-fired steam boiler blowdown? 1. Eliminate the suspended foam on the boiler water surface, thereby reducing the salt and alkali content of the boiler water, and avoiding the phenomenon of co-evolution of steam and water in the boiler.

Gas steam boiler After a period of operation, a certain amount of dirt will be generated, and these dirt need to be discharged out of the boiler within a limited time to maintain the good operation of the gas-fired steam boiler.

  1. What is the purpose of gas steam boiler blowdown?

  1. Eliminate the suspended foam on the boiler water surface, thereby reducing the salt and alkali content of the boiler water, avoiding the phenomenon of co-evolution of steam and water in the boiler, and ensuring the quality of steam.

  2, remove the dirt and sludge accumulated on the bottom of the drum and the lower header to avoid a series of problems.

   Two. Precautions for the blowdown of gas steam boilers

   1. Before the sewage discharge work, the water level in the boiler should be adjusted to the normal water level (exceeding), and the process should be strictly monitored to prevent water shortage.

  2. After the sewage has been discharged for a period of time, check whether the temperature of the sewage pipe is abnormal, so as to check whether the sewage valve leaks. If there is, it should be dealt with in time.

  3. For the blowdown work of gas-fired steam boilers, the three principles of frequent discharge, less discharge and uniform discharge should be followed, and the blowdown should be at least once per shift to avoid problems such as tube bursts in the boiler, which may cause serious consequences.

       4. The blowdown of gas-fired steam boiler should be carried out under the low load state of the boiler and under normal working pressure, and the switch should be operated and repeated several times, so as to ensure a better blowdown effect, and be carried out thoroughly at one time, so as not to have residues, thereby affecting the blowdown effect. And the normal operation of the boiler.

CONTACT US

Resolve Your Problems within One Minute

xinli email

Email:[email protected]

wechat

WeChat

xinli whatsapp

WhatsApp:0086-13803825084

xinli company address

Address:No.11 Minhe Road, Private Industrial Park, Development Zone, Kaifeng City

Contact Us

Resolve Your Problems within One Minute

xinli whatsapp

WhatsApp:0086-13803825084

wechat

WeChat

xinli company address

Address:No.11 Minhe Road, Private Industrial Park, Development Zone, Kaifeng City

INQUIRY

If you have any questions about our company and products,
please contact us immediately. Any inquiries and Suggestions would be appreciated.
We will keep your information confidential.

Power or Capacity:

Inquiry

If you have any questions about our company and products, please contact us immediately. Any inquiries and Suggestions would be appreciated.
We will keep your information confidential.

Power or Capacity:
online chat
order
0086-13803825084
[email protected]
Back Top